Examples
Examples for the application of Analytics (FC_Analytics).
General
The runtime of a machine should not exceed a specified time within a certain period (e.g. abrasion).
Forecast values (e.g weather, levels) can be compared with current values for the evaluation of the forecast.
Derivations of different meter reading locations should be detected, e.g. billed consumer consumption compared to personal customer meter reading.
The meter reading of a counter is performed automatically and manually. A possible derivation can be tolerated up to a certain value.
By counting the amount of archive values per day, the completeness can be monitored. Usually this is the case when meter readings are performed within a specific time frame.
A tank system is filled through two parallel pumps. Depending on the filling level of the tank, the two pumps will be activated when required. Next to the parallel operation of the pumps a low pace of the pumps should be achieved.
Other examples for systems:
-
Block-unit power station
-
Pumps
-
Ventilation systems
-
etc.
The monthly meter reading of the manual values for one site must be performed in the first week of the month. If a meter is missing, an automatic notification will be triggered and the processor will be informed just in time.
Energy Management / Building Energy Principles
The specific heating consumption kWh / m³ can be monitored via branch KPI's. The consumption should not exceed a certain value.
The efficiency of a plant can be quantified with specific KPI's. A continuous monitoring of these parameters enables to display inefficient operating status just in time and will allow to apply appropriate measures.
An alert based on live values may not be sufficient, since dynamic operating phases such as rising and descendant flanks could cause temporary fluctuations. This is why monitoring over a certain period is more targeted.
Further examples for efficiency:
-
Block-unit power station
-
COP for Heat Pumps
The fuel consumption of the vehicles in a company's fleet should be compared with a known average consumption.
The full-load hours required to achieve the maximum output of CHP units and PV systems should be compared with a standard industry value.
Monitoring the specific energy consumption of a production line requires a dynamic analysis method, as a comparison with fixed industry benchmarks is not effective due to individual consumption characteristics. Instead, a historical comparison is used to identify long-term trends in consumption behaviour.
A daily comparison is not meaningful due to the structural differences between working days and weekends. Therefore, the analysis is carried out on a weekly basis in order to better reflect seasonal and operational patterns.
Since absolute electricity consumption is strongly influenced by fluctuating production volumes, the focus is on a specific consumption indicator. This is calculated as the ratio of energy consumption to production volume and enables a reliable assessment of energy-related production efficiency.
The regression model of compressor consumption based on the amount of compressed air produced is compared with the actual consumption of the compressor.
Consumption (electricity, water, etc.) should be compared with the value from the previous year.
Water supply
It should be checked whether the specific water loss is within the normal range. The reference values vary depending on the federal state.
Option 1: The energy consumption for drinking water should be compared with the average value.
Option 2: There is no average value for energy consumption. Therefore, this should be compared with the previous year's value.
Wastewater
Option 1: The power consumption of the sewage treatment plant should be compared with the average value from the previous days/weeks/months.
Option 2: Energy consumption per inhabitant is to be calculated for one year. For this purpose, there is a guideline value for each federal state that should be adhered to.
The Self-Monitoring Ordinance (EKVO) is aimed at operators of wastewater treatment plants. Certain values must be complied with here. Usually, an annual report is submitted to the relevant authority.